我公司承建的河北省石家庄市井陉县夏能炘生活垃圾焚烧发电项目烟气净化系统提标改造工程于2023年02月20日开工建设。
The FGC upgradation and renovation project undertaken by Huaxing-east for Xianengxin waste incineration power plant in Jingxing, Shijiazhuang, began construction on February 20, 2023.
该项目建设总处理规模为1200t/d,建设2x600t/d的机械炉排垃圾焚烧生产线,配置2x12MW汽轮发电机组。烟气处理采用“SNCR(改造)+干法烟气脱酸(SDS)+活性炭喷射(非本次合同范围内)+布袋除尘器(非本次合同范围内)+SGH(蒸汽换热器)+低温SCR+催化剂(三菱重工)”的烟气净化工艺,为我司EPC工程。
The total plant processing capacity is 1200 t/d. 2x600 t/d mechanical grate incineration lines are constructed, equipped with 2x12 MW steam turbine units. The FGC adopted the process of "SNCR renovation + dry deacidification SDS + activated carbon injection (not contractor scope) + bag filter (not contractor scope) + SGH steam-gas-heater + low-temperature SCR + catalyst from Mitsubishi Heavy Industry". It is an EPC project of Huaxing.
华星东方在河北省的业绩涵盖包括:保定一期、二期、衡水、安平、定州、沧州一期、石家庄、曹妃甸、围场、顺平、唐山一期、二期、张家口北、固安、香河、滦州、沙河、石家庄夏能炘等多个项目。
The achievements of Huaxing East in Hebei Province include Baoding phase I & II, Hengshui, Anping, Dingzhou, Cangzhou phase I, Shijiazhuang, Caofeidian, Weichang, Shunping, Tangshan phase I & II, North Zhangjiakou, Gu'an, Xianghe, Luanzhou, Shahe, Xia Nenxin of Shijiazhuang, etc.
特别声明:北极星转载其他网站内容,出于传递更多信息而非盈利之目的,同时并不代表赞成其观点或证实其描述,内容仅供参考。版权归原作者所有,若有侵权,请联系我们删除。
凡来源注明北极星*网的内容为北极星原创,转载需获授权。